Home
 
 

Home
/ Facilities / Gary Works / RCRA /
Grand Calumet River

Gary Works


RCRA Corrective Action at the U. S. Steel Gary Works Facility

Grand Calumet River Remediation Project

Dredging Photo Archive CAMU  |  Water Treatment  |  Dredging

8" Hydraulic Dredge
Cell C Cofferdam Installation
Containment Cell B Cofferdam
River Restoration Half-Log
36" Bypass Piping
8" Dredge in Operation at Transect 17 Horizon 1
Launching 12" Dredge
Last Sheet Pile Installation in Cell A
Solvent Collection Boom Downstream of Dredge
12" Dredge in Transect 12 - 36
8" Dredge in Cell B
Aerial of GCR from Broadway
12" Hydraulic Dredge
Headwall Structure at West Calumet Lagoon culvert
River Mitigation Devices
River Restoration Willow-Stakes
Debris Box and Barge
3 - Element Water Quality Control Structure
Cell B Sheet Pile Installation
12" Dredge in Operation near Transect 16
Access Site B Installation
Discharge from Bypass Pumps
12" Dredge at Broadway
Dredge lines along the river
Containment Cell B Cofferdam
River Restoration Rocky-Riffle
River Restoration Wing-Deflector
Cell A Sheet Pile Installation
Launching 12" Dredge 2
Cell A South Bank Excavation
Open Water Dredging near Transect 15
8" Dredge in Cell A
Bypass Pump Barge
Bypass Pump Barge 2



Copyright 2012 United States Steel. All rights reserved. Site feedback.
Please see our Legal Notice for conditions regarding the use of this site and links provided to third-party Web sites.
Trademarks and Ownership